Projekt

Pipe Bridge / Karlsruhe

Medium Hot water
Length 53 m
Temperature 120 °C
Pressure 23,0 bar
Dimensions 2x DN200 inner pipe
DN900 casing pipe (paint coating and PE)
Special feature approx. 40 m long pipe bridge as a single construction unit
Country Germany
Year of construction 2018

 

zum Produkt

Self-supporting pipe bridge crossing a railway line with a span of 35 m. Consisting of three construction units with a twin-pipe configuration and transition pieces at both ends, as well as venting and drainage pipes. The pipe bridge, just under 40 m long, was fully prefabricated, including a paint coating resp. a PE coating in the track area for electrical insulation, and then transported to Karlsruhe by special transport.

Overview