Projekt
Pipe Bridge / Karlsruhe
| Medium | Hot water |
| Length | 53 m |
| Temperature | 120 °C |
| Pressure | 23,0 bar |
| Dimensions | 2x DN200 inner pipe DN900 casing pipe (paint coating and PE) |
| Special feature | approx. 40 m long pipe bridge as a single construction unit |
| Country | Germany |
| Year of construction | 2018 |
zum Produkt
Self-supporting pipe bridge crossing a railway line with a span of 35 m. Consisting of three construction units with a twin-pipe configuration and transition pieces at both ends, as well as venting and drainage pipes. The pipe bridge, just under 40 m long, was fully prefabricated, including a paint coating resp. a PE coating in the track area for electrical insulation, and then transported to Karlsruhe by special transport.